Over the years, we have been improving construction techniques thanks to our experience and training
We manage to make complex things simple through ingenuity and, above all, working hand in hand with technical and field teams.
Taking care of the details is one of the keys for our success
Our team maximises the experience of our members and the passion for the work we do.
River areas
Management and restoration of river areas · Management of erosion and transport of sediments · Consolidation of riverbanks and slopes · Integration of works in river areas (collectors, irrigation channels, dips, bridges…) · Creation of pedestrian crossings.
Executed works · Selection of final reports
These final reports here are in English, we will try to have more soon.
To see them in Catalan or Spanish please change the language in the upper right corner of the page.
- Removal of a weir in the Riera Major Guilleries-Savassona Natural Area, Osona, Barcelona
- Protection actions against flooding episodes in a section of Vallmanya stream in the urban area of Fibracolor in Tordera, Maresme, Barcelona
- Bioengineering works in the Plan for the improvement of the Tenes riverside in Santa Eulàlia de Ronçana, Vallès Oriental, Barcelona
- Improvement of Saltseseugues stream in Begur, Baix Empordà, Girona
- Restoration of the Vallicrosa stream at the section of Font del Pic in Sant Hilari Sacalm, Girona
- Stabilization of a section on the right bank of Can Cabassa torrent, between Tenerife and Lanzarote Street in Sant Cugat del Vallès, Barcelona
- Millora dels marges del Canal dels Jardins de Mon Racó al Prat de Llobregat
- Creació d’un camí fluvial des del pont de Turell fins a la palanca de Castellar Vell al riu Ripoll de Castellar del Vallès
- Millora de la riera de Saltseseugues a Begur
- Protecció d’un tram de talús al passeig fluvial del riu Mogent a Montornès del Vallès
- Millora d’un afluent del torrent de l’Argentinita al seu pas entre el carrer Margalló i el carrer de Major del Rectoret
- Actuacions de protecció davant avingudes en un tram de la riera de Vallmanya en la zona urbana de Fibracolor del municipi de Tordera
- Millora de la funció del connector ecològic en l’àmbit de la Riera del Tordell a Súria
- Creació de dos passos en pedra per a persones al riu Ripoll a Castellar del Vallès
- Arranjament del pas del torrent de la Verneda a Rubí
- Retirada d’una resclosa a la riera Major dins l’Espai Natural Guilleries-Savassona
Wetlands
Creation and restoration of wetlands · Revegetation of pond banks · Creation of naturalized lakes · Floating systems.
Executed works · Selection of final reports
Some final reports are here in English and the rest in Catalan, we will try to have more in English soon. To see them in Spanish please change the language in the upper right of the page.
- Works of naturalization of the Palmeral zone pond Barcelona Zoo
- Creation of a wildlife pond in a drainage stormwater channel at Winery Torres, Vilafranca del Penedès, Barcelona
- Naturalization work of the Falgar pond in Franqueses del Vallès (Barcelona)
- Creation of a lamination pond and improvement of the stream of Sant Llorenç in the new urbanized zone from Ca n’Alemany in Viladecans (Barcelona)
- Revegetation of the Botanical Garden lake in Olarizu (Vitoria-Gasteiz)
- Creation of Can Cabanyes wetlands, Granollers (Barcelona)
- Millora de la sortida de pluvials del torrent de la Talaia a la platja de Calafell
- Naturalització i millora i/o potenciació de la fauna de 5 basses
- Treballs de recuperació de la bassa de Can Balasc a Collserola
- Instalꞏlació d’illes flotants vegetades a l’estany de la Murtra
Degraded land
Environmental and ecological restoration of degraded land.
Executed works · Selection of final reports
Some final reports are here in English and the rest in Catalan, we will try to have more in English soon. To see them in Spanish please change the language in the upper right of the page.
- Enhancement of the Rossinyol Square in Vacarisses (Barcelona)
- Projecte d’arranjament de 19 fonts del Parc Natural de la Serra de Collserola al TM de Barcelona
- Millora de la Font del Lleó a El Papiol
- Gestió dels escorrentius de la zona de muntanya al recinte de Llars Mundet
- Millora de la font de Sant Josep Oriol a Rubí
- Recuperació del Safareig de Can Jornet i d’un tram de la sèquia, a Gallecs
- Arranjament de la Font de Can Tiraïres a Rubí.
Slopes
Management, protection and stabilization of slopes.
Executed works · Selection of final reports
Some final reports are here in English and the rest in Catalan, we will try to have more in English soon. To see them in Spanish please change the language in the upper right of the page.
- Consolidation of the slopes of the Parking Service Castellbisbal (Barcelona)
- Slope consolidation in the Palangrers Beach (Roses, Girona)
- Slope restoration in Nestlé Waters bottling plant in Viladrau, Girona
- Reparació del talús del camí de Canyelles a Castellar del Vallès
- Restauració d’un talús a la riera de Vilamajor, a Sant Antoni de Vilamajor
- Conservació dels talussos de greda volcànica de la pista d’accés al Volca de Santa Margarida
- Consolidació del talús del carrer del Mar, Premià de Dalt
- Reparació del talús al camí de Castellví, Sarrià-Sant Gervasi, Barcelona
- Consolidació d’un talús al Parc del Laberint d’Horta a Barcelona
- Millora dels talussos a les Escales Parsifal de Can Rectoret, Barcelona
- Millora d’un afluent del torrent de l’Argentinita al seu pas entre el carrer Margalló i el carrer de Major del Rectoret
- Restauració del talús del Castell de Canals
- Gestió dels escorrentius de la zona de muntanya al recinte de Llars Mundet
- Arranjament d’uns talussos al riu Ripoll a Barberà del Vallès
Natural depuration
Design and development of natural depuration systems in artificial wetlands.
Executed works · Selection of final reports
Final reports are here in Catalan, we will try to have more in English soon.
To see them in Spanish please change the language in the upper right of the page.
- Instal·lació d’un tractament terciari de depuració amb sistemes naturals al Càmping Fontmartina, dins del Parc Natural del Montseny
- Construcció d’un VSSF per a la millora del tractament d’aigües residuals del refugi de l’Estany Llong
- Construcció d’un sistema de depuració natural a la finca de producció hortícola ecològica de Conreu Sereny
- Creació dels aiguamolls de depuració terciària de Can Cabanyes, Granollers
Paths and trails
Restoration of paths and trails.
Executed works · Selection of final reports
Some final reports are here in English and the rest in Catalan, we will try to have more in English soon. To see them in Spanish please change the language in the upper right of the page.
- Execution works of planning the biodiversity itinerary in Park Güell, Barcelona
- Millora de la pujada al camí del Turó del Mont a Vallvidrera
- Millora del camí d’accés a la font del Cosí
- Creació d’un tram de sender i un pas en pedra al camí de Castellar Vell en l’encreuament del riu Ripoll a Castellar del Vallès
- Creació d’un camí fluvial des del pont de Turell fins a la palanca de Castellar Vell al riu Ripoll de Castellar del Vallès
- Ordenació dels accessos a l’Ermita de Sant Feliuet de Savassona
- Protecció d’un tram de talús al passeig fluvial del riu Mogent a Montornès del Vallès
- Creació d’una escala de connexió entre el passatge Reixagó i la Rotonda del carrer del Bosc a través del talús existent al T.M. de Montcada i Reixach
- Treballs de millora del primer tram del camí de Puigmoltó a Rocamar
- Arranjament dels camins d’accés a la Font de les Rovires
- Pla d’actuacions de restauració de zones degradades al voltant del Monestir de Sant Llorenç del Munt
Dry stone
Dry stone works.
Executed works · Selection of final reports
Final reports are here in Catalan, we will try to have more in English soon.
To see them in Spanish please change the language in the upper right of the page.
- Construcció d’una vedruna de pedra en sec per a conills a la vall de Joan al Garraf
- Restauració de l’Aqüeducte del Rec de l’Obaga de Vallcàrquera
- Restauració murs de pedra en sec Ruta dels Arbres a la riera de Vallcàrquera
- Creació d’un itinerari i restauració d’un conjunt monumental de barraques de vinya a Vacarisses
- Restauració del mur del moll de la Meda gran
- Restauració murs de pedra seca camins connexió Collbato, Parc de Montserrat
- Reconstrucció de la barraca de pedra seca ED36 al tm de Rajadell (Bages)
- Millora de l’estructura de la font de Ca n’Oriol a Rubí
- Projecte de trasllat de la barraca del Fondo de Montseva al Garraf
- Projecte d’adequació a l’ús públic de l’entorn i els accessos de les tines de pedra seca de la vall del flequer
- Projecte de camí litoral i accessos al paratge de la Punta de la Creueta, Tarragona
Other areas
Executed works · Selection of final reports
Final reports are here in Catalan, we will try to have more in English soon.
To see them in Spanish please change the language in the upper right of the page.
Historical heritage
- Projecte d’arranjament de 19 fonts del Parc Natural de la Serra de Collserola, Barcelona
- Restauració de l’Aqüeducte del Rec de l’Obaga de Vallcàrquera
- Pla d’actuacions de restauració de zones degradades al voltant del Monestir de Sant Llorenç del Munt
- Actuacions de millora en l’àmbit del Jaciment de Mons Observans
- Restauració de la bassa de Joan Romanyà i sistemes de drenatge a Collbató
- Reconstrucció de la barraca de pedra seca ED36 al tm de Rajadell (Bages)
- Projecte de valorització del patrimoni natural i cultural Necròpolis de Can Robert
Leisure and non-urban spaces
- Millora del camí d’accés a la font del Cosí
- Construcció de dos sorrals als patis de l’Escola Bressol El Petit Montseny a Breda
- Projecte d’arranjament de 19 fonts del Parc Natural de la Serra de Collserola al TM de Barcelona
- Creació d’una escala de connexió entre el passatge Reixagó i la Rotonda del carrer del Bosc a través del talús existent al T.M. de Montcada i Reixach
- Construcció de la segona fase d’un entramat Krainer i un paviment de fusta, al Cementiri Comarcal de Roques Blanques a El Papiol
- Millora de la Font del Lleó a El Papiol
- Gestió de les aigües d’escorrentiu a l’àmbit de la Font del Racó Parc Natural de la Serra de Collserola
- Adequació dels patis de les escoles Pau Casals i Sant Jordi de Montmeló amb tècniques de bioenginyeria del paisatge i amb la participació de l’alumnat
- Construcció d’unes escales que connecten el riu amb la catedral de Solsona
- Millora paisatgística de l’entorn del Centre d’Informació de Coll d’Estenalles